About

<

About BOMC Facility

  • Phase 1 – due for operation September 2018
    • 200 meters wharf
    • 10 meters depth LAT
    • 10 ton per m2
    • 12 HA laydown
    • Offices and amenities
  • Phase 2 – delivery by Q2 2020
    • 480 meters wharf
    • 10 meters depth LAT
    • 10 ton per m2
  • Phase 3 – due for delivery concurrently with phases 1 & 2
    • Up to 84 HA rear laydown
    • Connected via internal road to wharf frontage 12 HA
    • Spool base – 2.3km length spooling line
  • Deep water anchorages located adjacent to BOMC that allows clients to warm or cold stack vessels or rigs, serviced from BOMC facilities
  • BOMC is based in BIE free trade zone
  • BOMC has International Port status – thus international vessels can berth and load / discharge international cargoes
  • BOMC can tailor facilities to clients requirements – we will develop facilities that our clients require to operate
  • BOMC has 30 year lease thus allowing investment in infrastructure over a long
    period
  • Long term leases available to Clients
  • On site business centre for ease of operations for our clients
  • Cargo connectivity – BOMC is connected via daily LCT services Jurong Port to and from Lobam, as well as barge services on request
  • Large range of mobile equipment on site :
    • SPMT’s
    • Crawler cranes, mobile cranes
    • Forklifts
    • Boom lifts